AZERBAIJAN - clean up - environment

Projet
Feasibility Study for Lake Khojasan Sustainable Cleanup and Area Rehabilitation.

The objective of the study is to provide the GoA with viable technical and economic options for sustainable remediation and area redevelopment of the Khojasan Lake and adjacent areas.
Formation
-Environment engineer
-Civil engineer
-Urban planner
Expérience
• Environmental engineer with experience in remediation of water and soil contamination; assessment of contaminated industrial sites, environmental impact assessment and mitigation. The environmental engineer should have knowledge in international remediation standards to be able to assess soil and sediment characteristics for determining remediation alternatives (estimated inputs 12 man-months)

• Civil engineer shall have knowledge and experience in functional design of remediation facilities, remediation technologies of contaminated sites including water bodies (estimated inputs 7 man- months)

• Land use/Urban planner shall have experience with the environmental planning concepts and Azerbaijan land use standards pertaining to quality of soil; familiarity with GBDP will be a requirement. (estimated inputs 5 man-months)
Contact
Interested in this project? Please apply below mentioning the reference 198/642/09B/PMO in subject
 
Postuler
Environment
Pays de résidence
Azerbaijan
Postuler avant
12/05/2019
Début
16/06/2019
Domaine d'expertise
Environment
Langue
English
Référence
198/642/09B