Flood Control - Team Leader

Projet
The key objective of the project is to assist the government in planning and preparation of public sector priority infrastructure investments. For each priority investment subproject the consulting company may be required to carry out the following activities:
(i) pre-feasibility studies (which may include preparation of master plans or other studies);
(ii) feasibility studies;
(iii) preliminary design studies and surveys;
(iv) detailed engineering design;
(v) preparation of bidding documents and assistance to the implementing agencies in the tendering process;
vi) preparation of consultant selection documents and assistance in the recruitment of construction supervision consultants.
Formation
University degree in engineering or other relevant field
Expérience
- Minimum 20 years of professional experience related to preparation of master plans/feasibility studies/detailed engineering design of various infrastructures
- Minimum 15 years in professional experience as Project Manager/Team Leader of development studies in flood control and/or other water infrastructures
- Experience in the Philippines or similar geopolitical environment would be considered an asset
 
Postuler
Water & Hydraulics
Pays de résidence
Philippines
Postuler avant
30/11/2017
Début
01/02/2018
Domaine d'expertise
Water & Hydraulics
Durée
42 months
Terme
Longue durée
Langue
English
Référence
178/1080/004